Facility

 

Precision Controls Building exterior

Precision Controls started in 1955. In May 2025, Senasys acquired Precision Controls and we relocated to our current location in Eau Claire, Wisconsin.

Contact us if you have specific questions about our facilities or capabilities.

   
  • 6,000 square foot building on 1.4 acres
  • Located adjacent to the Interstate
  • Equipment:
    • Welding
      • Miyachi 2KHz High Frequency Resistance Welder
      • Taylor Winfield Air Operated Resistance Welder
    • Riveting
      • Chicago Rivet Model 450
    • Circulating Baths
      • Forma Scientific Model 2095
      • Lauda RA24
      • Lauda E10
    • Heat Treating
      • Blue M Model DC-206 Convection Oven
    • Stamping
      • Kenco Taber 5 Ton Press
      • Alva Allen 5 Ton Press
      • Walsh 10 Ton Press
      • Bliss 20 Ton Press
    • Metal Working
      • Craftsman Drill Press
      • Craftsman Lathe
      • Reid Surface Grinder
      • Rong Fu Mill
    • Various Specialized Automation Equipment